# 03 | 191025 Unionville-Chadds Ford School District Renovations to the C.F. Patton Middle School Cafeteria Kennett Square, PA Date of Addendum: 25 October 2019 Marotta/Main Architects Project No. 19-UCFSD-03 The original Project Manuals and Drawings dated 09 October, 2019 for the project noted above, are amended as noted in this Addendum No. 03. Receipt of this Addendum shall be acknowledged by inserting its number and date in the space provided on the Bid Form. This Addendum consists of 1 Pages and all attachments listed. DRAWINGS: FOOD SERVICE DRAWINGS: 03.01 Refer to Food Service drawing sheet QF-0.0 FOOD SERVICE COVER SHEET: Food service scope chart revised per attached sheet. 03.02 Refer to Food Service drawing sheet QF-1.1 FOOD SERVICE KITCHEN & FOOD COURT LAYOUT: Kitchen equipment schedule revised per attached sheet. END OF ADDENDUM 04 Respectfully Submitted, Westley Enterline, AIA Marotta/Main Architects, Inc. Attachments: Sheet QF-0.0 – Addendum 03 Sheet QF-1.1 – Addendum 03
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
# 03 | 191025
Unionville-Chadds Ford School District Renovations to the C.F. Patton Middle School Cafeteria Kennett Square, PA
Date of Addendum: 25 October 2019
Marotta/Main Architects Project No. 19-UCFSD-03
The original Project Manuals and Drawings dated 09 October, 2019 for the project noted above, are amended as noted in this Addendum No. 03.
Receipt of this Addendum shall be acknowledged by inserting its number and date in the space provided on the Bid Form.
This Addendum consists of 1 Pages and all attachments listed.
DRAWINGS:
FOOD SERVICE DRAWINGS:
03.01 Refer to Food Service drawing sheet QF-0.0 FOOD SERVICE COVER SHEET: Food service scope chart revised per attached sheet. 03.02 Refer to Food Service drawing sheet QF-1.1 FOOD SERVICE KITCHEN & FOOD COURT
LAYOUT: Kitchen equipment schedule revised per attached sheet.
END OF ADDENDUM 04
Respectfully Submitted,
Westley Enterline, AIA Marotta/Main Architects, Inc.
+ Above Finished FloorA AmperageAFC Above Finished CeilingAFF Above Finished FloorBTC Branch to ConnectionBTU British Thermal UnitBy Vendor Supplied by the vendor supplying the product. Vendor is sourced by the end user.By Others Supplied by someone other than the Kitchen Equipment ContractorDFA Down from AboveEC Electrical ContractorExisting to Remain Existing Equipment that will remain in its current locationExisting to Relocate Existing Equipment that will be moved to a new locationFuture Equipment ot currently being installed but planned for future useHP HorsepowerKEC Kitchen Equipment Consultant/ ContractorKW KilowattsNEW New Equipment to be supplied by the Kitchen Equipment ContractorNIKEC Not in Kitchen Equipment ContractPC Plumbing ContractorTOH Top of HoodTOW Top of Walk-in BoxV VoltageVFY Verify
PROJECT TEAM
FOOD SERVICE SCOPE
DRAWING INDEX
BUILDING
MAP
Food Service Equipment
Existing Food Service Equipment
Remote Refrigeration
Exhaust Hood
Exhaust Duct
Exhaust Fans
Millwork
Interior Design
Final Connections
MUA Duct
MUA Fans
Exhaust/ MUA System Controls
Fire Supression System
Renovation
CF Patton Middle
School
OWNERUnionville Chadds Ford School DistrictMarie Wickersham610.347.0970 ext [email protected]
ARCHITECTMarotta Main ArchitectsWestley Enterline717.393.3211 Ext. [email protected]
Utilities: Steam, Electric Max - Not Determined, GAS: LP or Natural?
Menu: Grill, Homestyle, Salad Bar, Mexican, Vegan, Bakery, Deli.
Beverages Served Self Served
Notes or NA
Notes or NA
Notes or NA
Waited Table Waited w/ Salad BarForms of Service Cafeteria
Scatter System Food Court Counter
Tray Service Banquet Room Service
Tray slide in Millwork Separate Integrated None
Seating Capacity 400 Students
Hours of Operation Breakfast, Lunch
Tableware China Silverware Cups, Glass or Plastic
Disposables Trays
Notes
Notes
X
X
X X
X
X
X
X X
Sheet Number Sheet Name Sheet Issue Date
QF-0.0 Food Service Cover Sheet August 21, 2019
QF-1.1 Food Service Kitchen & Food Court Layout August 21, 2019
QF-2.1 Food Service Elevations August 21, 2019
QF-2.2 Food Service Elevations August 21, 2019
QF-3.1 Food Service 3D Drawing August 21, 2019
QF-4.1 Food Service Plumbing Rough-Ins August 21, 2019
QF-5.1 Food Service Electrical Rough-Ins August 21, 2019
HVAC Consultant
KEC / Architect
Architect
KEC / Architect
Owner
HVAC Contractor
MEP Trades
GC, MC/PC/EC as required
HVAC Contractor
MEP Trades
HVAC Contractor
Kitchen Equipment Consultant
Kitchen Equipment Contractor
General Contractor
General Contractor
General Contractor
General Contractor
Kitchen Equipment Contractor
General Contractor
General Contractor
General Contractor
General Contractor
7
A
SHEET TITLE:
PROJECT #:
SHEET NUMBER:
B C D E F G H I J
6
5
4
3
2
1
A B C D E F G H I J
SE
AL:
TH
IS D
RA
WIN
G I
S T
HE
PR
OP
ER
TY
OF
TH
EA
RC
HIT
EC
T. I
T M
AY
N
OT
BE
PR
OD
UC
ED
IN
AN
Y F
OR
M W
ITH
OU
T W
RIT
TE
N P
ER
MIS
SIO
N.
CO
NS
UL
TA
NT
:
10
/25
/20
19 9
:56
:02
AM
Project Number
Food Service Cover
Sheet
QF-0.0
ADDENDUM 3
CAFETERIA RENOVATION
CF Patton Middle SchoolUnionville Chadds Ford School District
CA
FE
TE
RIA
RE
NO
VA
TIO
N
CF
Pat
ton M
iddl
e Sch
ool
760
Unio
nvi
lle
Roa
dK
ennet
t Squ
are,
Pen
nsy
lvan
ia
Unio
nvi
lle
Chad
ds F
ord
Sch
ool
Dis
tric
t
To follow Architects Timeline
HVAC Consultant
HVAC Consultant
HVAC Consultant
Kitchen Equipment Consultant
Kitchen Equipment Consultant
Kitchen Equipment Consultant
Kitchen Equipment Consultant
HVAC Contractor
HVAC Contractor
HVAC Contractor
HVAC Contractor HVAC Contractor
HVAC Contractor
HVAC Contractor
General Contractor General Contractor
Redesign the existing kitchen and food court area to create amore functional use of space. Kitchen and Food Court to becapable of serving up to 1000 students in three lunch periods.
INTERIOR DESIGNERMarotta Main ArchitectsMegan Rippon717.393.3211 Ext. [email protected]
Schematic Design - June 20, 2019 - Design meeting on site with Marie Wickersham, FSD for Unionville Chadds Ford School District.Schematic Design - R2 - July 17, 2019 - Review of drawing on site with Marie Wickersham. Drawing was tentatively approved with a few additional changes.Schematic Design - R3 - July 29, 2019 - Revisions based on review from Marie Wickersham.Owner Review Set - August 21, 2019.